Why must the burial depth be 2-6 meters
Question added: the meaning of 2-6M. The first irrigation is not a catheter with a depth of 70-80 cm. Then I think it is not enough to bury 1M in the irrigation.
Just checked the pile foundation specification mentioned in 6.3.30, one pouring is embedded in the concrete pouring surface not less than 0.8m;
The buried pipe 2-6m refers to the depth control of the buried pipe during the pouring process; however, I think it is not realistic because many pile foundations are now commercial concrete. When 1.2m piles go up by one car, the concrete surface rises 8m. It is possible to dismantle the pipe so many times in one car; once the construction is buried, the pipe is almost 20 meters. I think 2-6m is the requirement for the self-mixed concrete in the past, and the strength of the current pipe is also high, so the depth of the buried pipe can be enlarged.
The buried depth of the catheter should be controlled at 3-6 meters. The main reason is that your buried pipe is too deep. If the temperature of the pouring pile is not lower than -5 degrees in winter, there is no problem in waiting for 2 hours. The catheter is moved back and forth for 10 minutes. The main part of the pouring pile during the pouring process is the buried depth of the catheter, and the mass of the concrete. To prevent holes, so as not to empty the catheter!
In the case of pouring concrete, the mud-wall-protected cast-in-situ pile mainly controls the initial irrigation and the buried depth of the duct.
all rights reserved:Xinhe County Huagou Piling Driving Machinery factory 
Address: Located at the 50 meters south of Tian Jiu Tai Ke Courtyard, south side of Chunqiu Road, West side of 308 National Road, Xinhe County, Xingtai City
TEL:86-0319-4891497 Phone:18603192304 FAX:86-1324-7468123 technical support:ronglida Technical Support:ronglida.net.cn ICP:13016323-1 Business license
新河县华构桩工机械厂是专业生产:正反循环钻机,正循环钻机,灌注桩钻机,车载钻机,步履式打桩机,液压打桩机,反循环钻机厂家