Contact UsContact Us

Huagou Piling Driving Machinery

Tel:0319 4891497

Director Jia:18603192304

Manager Yin:13247468123

Web:www.qianshuizuanji.com

Web:en.qianshuizuanji.com

Address: Located at the 50 meters south of Tian Jiu Tai Ke Courtyard, south side of Chunqiu Road, West side of 308 National Road, Xinhe County, Xingtai City

How to maintain the power head rig in use?

How to maintain the power head rig in use?

2019-11-08
second

How to maintain the power head rig in use?


1, Power head rig--clean


Remove the sludge from the power head rig, scrub the dust, and keep the equipment tidy;


2. Check the power head rig (the project is carried out when the machine is started without load)


A. Power head rig--before starting


Check whether the fuel quantity of each fuel tank is sufficient and whether the oil quality is normal;


Check whether the amount of oil in the gears of each reducer is sufficient and whether the oil quality is normal;


⑶, check if there is any oil leakage fault;


 Check whether the main and auxiliary wire ropes have broken wires and their connections are safe, reliable, and intact, and whether the rope presser strength is sufficient;

Check whether the lifter can rotate flexibly and the internal butter is polluted;


 Inspect the steel structure for cracks, rust, desoldering and other damage, and repair it;


Check whether the capacity of the battery's electro-hydraulic medium is sufficient;


Check whether the water cup of the oil-water separator is normal;


B. Power head rig-when running


Check whether all electrical components work normally;


Check whether the device has an alarm failure in the Carter monitoring board and touch screen (when the power is on but the engine is not started);


⑶, check the equipment for abnormal sounds;


Check whether the sports institutions work normally;


Check whether the hydraulic components and meters are normal;


Check whether the diesel engine works normally and whether the oil is normal;


3. Power head drilling rig-fastening


A. Fasten the loose hoses;


B. Tighten loose bolts;


4. Power head drilling rig--lubrication


a. Fill the moving parts of each mechanism with butter, especially when the swivel surface is large, such as the slewing support on the car and the slewing support of the follower frame, so that the entire swivel surface is fully lubricated. once;


B. Lubricating the wire rope requires that the wire rope be covered with butter;


C. Fill the other lubricating parts with lubricating oil according to regulations;


5. Replacement: timely replace damaged parts and components;


6. Adjustment: adjust the abnormal stroke and clearance everywhere;


7. Anticorrosion: take measures to prevent corrosion of equipment

Label

Recent:

Related products

Related news

all rights reserved:Xinhe County Huagou Piling Driving Machinery factory 

Address: Located at the 50 meters south of Tian Jiu Tai Ke Courtyard, south side of Chunqiu Road, West side of 308 National Road, Xinhe County, Xingtai City

TEL:86-0319-4891497 Phone:18603192304 FAX:86-1324-7468123 Technical Support:ronglida.net.cn ICP:13016323-1 Business license

新河县华构桩工机械厂是专业生产:正反循环钻机,正循环钻机,灌注桩钻机,车载钻机,步履式打桩机,液压打桩机,反循环钻机厂家

Online consultation