At the current stage, the construction of domestic underwater concrete pouring pipe engineering is usually carried out by the pipe method. The principle is that under the action of a certain drop pressure, the concrete mixture passes through the entrance of a sealed steel pipe (or a hard non-metallic pipe with higher strength) and enters the concrete under the initial pouring, supporting the concrete and The mud or water on it rises to form a continuous dense concrete pile. The technical requirements of the duct method are very strict. In order to ensure the construction quality of underwater concrete cast-in-situ piles, it is necessary to control it from the aspects of construction equipment, concrete preparation, and pouring to improve the underwater construction quality.
Strict requirements for the quality of construction equipment
Construction equipment required for concrete pouring must be complete and intact. This is the basic premise for ensuring the quality of poured concrete. To emphasize the quality of the following construction equipment:
1) The number of backup generators is sufficient. It is necessary to ensure that the performance of the backup generator at the construction site is good enough to cope with the power outage situation that may occur during the construction process, which can prevent the delay of the filling time.
all rights reserved:Xinhe County Huagou Piling Driving Machinery factory 
Address: Located at the 50 meters south of Tian Jiu Tai Ke Courtyard, south side of Chunqiu Road, West side of 308 National Road, Xinhe County, Xingtai City
TEL:86-0319-4891497 Phone:18603192304 FAX:86-1324-7468123 technical support:ronglida Technical Support:ronglida.net.cn ICP:13016323-1 Business license
新河县华构桩工机械厂是专业生产:正反循环钻机,正循环钻机,灌注桩钻机,车载钻机,步履式打桩机,液压打桩机,反循环钻机厂家